WOO-420-2.35/WOO-280-0.00
Wood County, Ohio
Project:
2LMN was the prime consultant for this Loon Style Median-U-Turn in Wood County where the Ohio Turnpike exits onto S.R. 280 at the intersection of Libby Road and S.R. 420. The project was to construct a Median-U-Turn to alleviate an immediate merge that occurred from trucks exiting the Turnpike and having to immediately crossover two lanes to make a left onto Libby Rd. The project required the implementation of both Ohio Turnpike standards and ODOT standards. The project was constructed at a construction cost of $ 2.6 million. Construction was completed in 2015.
Client:
ODOT District 2
Estimated Construction Cost:
$2,643,881
Services:
Roadway, Survey