Horns Mill Road Bridge Replacement

Client: Fairfield County Engineer

Location: Berne Township, Ohio

Estimated Construction Cost: $1.598,000

 

Horns Mill Road Bridge Replacement

2LMN was the prime consultant on this bridge replacement/relocation project for the Fairfield County Engineer’s office. The project proposed to replace the deteriorated single-span, steel truss bridge in a new location that improves the roadway geometrics of Horns Mill Road at the bridge location. The goals of the project were to provide a cost-efficient replacement for the deficient bridge and improve the horizontal alignment of Horns Mill Road within the project’s limits so that it was more in-line with the current speed limit. 2LMN has able to meet all project goals and schedules, despite rigorous coordination with TransCanada.

Services Provided

  • Bridge Design
  • Drainage
  • Hydraulics
  • Maintenance of Traffic
  • Roadway Design
  • ROW Plan Development
  • Survey
  • Utility Coordination