JAC-93-14.29 Signal Upgrades

Client: ODOT District 9

Location: Jackson, Ohio

Estimated Construction Cost: $1,067,650

 

JAC-93-14.29 Signal Upgrades

2LMN was the prime consultant on this ODOT District 9 Safety Design Project. This project consisted of the reconstruction and various upgrades to the existing traffic signals on SR93 in the City of Jackson Ohio. The project included enhancements to 11 signalized intersections. The traffic signal upgrades included backplates, radar detection, LED signal heads, new controllers and cabinets. A few intersections included signal mast arm pole replacements. And the whole corridor was interconnected with fiber optic cable. At each intersection with existing curb ramps, each ramp was evaluated for ADA compliance and those which did not meet current standards were replaced.

Services Provided

  • Roadway Design
  • Survey
  • Traffic Engineering