by 2LMN, Inc. | Sep 7, 2021
LAK-20-9.47 Mentor, Ohio Project: This project involved the widening of Mentor Avenue (U.S. 20) to accommodate a center 2-way left turn lane between Center Street (S.R. 615) and Murray Avenue. It also added a second left turn lane at the S.R. 615 intersection for...
by 2LMN, Inc. | Jun 16, 2021
LIB-26/FAI-TR251-0.406 Fairfield County, Ohio Project: 2LMN, Inc. is the prime consultant on this bridge replacement project for the Fairfield County Engineer. The project proposes to replace the deteriorated single-span, concrete box beam bridge with a similar single...
by 2LMN, Inc. | Jun 10, 2021
FRA‐270‐24.47 Franklin County, Ohio Project: As a result of an extensive traffic and accident study, the Ohio Department of Transportation (ODOT), Central Office identified the I‐71/I‐270 interchange as one of the most dangerous in the state. The northern suburbs of...
by 2LMN, Inc. | Jun 7, 2021
WOO-420-2.35/WOO-280-0.00 Wood County, Ohio Project: 2LMN was the prime consultant for this Loon Style Median-U-Turn in Wood County where the Ohio Turnpike exits onto S.R. 280 at the intersection of Libby Road and S.R. 420. The project was to construct a Median-U-Turn...
by 2LMN, Inc. | Jun 3, 2021
LAW-52-17.27 Roundabout Lawrence County, Ohio Project: 2LMN was the Engineer of Record of the Allard Excavation, LLC design-build team for a roundabout located in Lawrence County, OH. This project included a complex roundabout at the US-52 interchange at CR-18 (Solida...